Occupied spaces get phased schedules: loud work after hours, quiet work during, and a daily tidy whatever the hour. Your business stays open; the project stays on sequence.
What's included
- Commercial construction and renovation
- Commercial space design and build
- Tenant improvements — offices, retail, medical-adjacent
- Commercial bathroom build-outs and ADA-conscious upgrades
- Commercial roofing
- Permit expediting and inspection scheduling
- After-hours and phased construction to keep you open
- Closeout documentation and punch-list delivery
Why homeowners pick Ofir
- Storefronts, offices, and tenant improvements phased around business hours.
- Licensed and accountable — CSLB #1036242, verify us at cslb.ca.gov.
- One contract for design, permits, every trade, and the final walkthrough.
- Permits and inspections handled in-house by our own office.
- A polite, thorough crew — the words our Google reviewers use most.

Signs it's time to call
- The space no longer matches how the business actually operates
- You're signing a lease on raw space that needs a full build-out
- ADA or code upgrades just landed on the to-do list
- Downtime is the real cost — you need phased scheduling
How the project runs
- 1
Walk the space and define use, code path, and budget
- 2
Written scope with phasing around your operations
- 3
Permits and landlord approvals managed by our office
- 4
Build, inspect, and deliver closeout documents
Timeline: Build-outs run four to twelve weeks by scope, sequenced around your operating hours. The estimate states the phases and which of them are noisy.
Getting ready: Commercial prep is coordination: confirm building-management rules, elevator and freight bookings, and which hours are quiet hours. The scope states the phases around your operations — that document is the prep.

What the written estimate actually covers
Your Commercial Construction estimate lists scope, materials, allowances, permits, and a phase-by-phase schedule, all priced from a free on-site visit. If something was missed in the walkthrough, we fix it at our cost instead of billing it back as a surprise change order. You pay at completed milestones, never in large advances: state law caps residential down payments at 10% or $1,000 and we follow it exactly. At the end of the job we review the finished work with you item by item, make sure inspections are closed, and hand over a tidy site. Questions afterward go straight to the office that managed the project — the same team, the same file, the same phone number you called on day one.
Related services: General Contracting and Home Remodeling · Roofing Services — General Contracting and Home Remodeling and Roofing Services often share a scope with Commercial Construction on the same job, so combining them keeps one contract, one crew, and one calendar.
Serving Van Nuys, Woodland Hills, Porter Ranch, Mission Hills and nearby
Read next
Who Issues Your Building Permit in the San Fernando Valley →How to Hire a Licensed Contractor in California (Checklist) →“Phenomenal work designing and executing. The crew was professional, clean, and polite — we would hire them again.”
Questions we hear about commercial construction
Can you work while our business stays open?
Yes — phased and after-hours scheduling is standard on occupied commercial jobs. The scope states which hours are noisy and which aren't.
Do you handle ADA-related upgrades?
Yes — restrooms, entries, and path-of-travel upgrades are common parts of our commercial scopes, planned with your permit path.
What areas do you serve commercially?
Winnetka and the west Valley first — Canoga Park, Reseda, Van Nuys, North Hollywood, Sun Valley — plus greater Los Angeles projects within about twenty miles.
How is commercial pricing structured?
Every job starts with a free walkthrough and a written scope. We price commercial work as a firm bid or time-and-materials with a not-to-exceed — your choice, stated up front.