Kitchen Remodeling in Winnetka and the west Valley

Quick answer: Custom cabinets, countertops, backsplash, islands, lighting, and the plumbing and electrical behind them — designed and built by one crew. Kitchen remodeler is one of our core categories, and the kitchen is where a whole-home remodel usually starts.
Kitchen remodel by Ofir Construction — modern cabinets and stone countertops
Kitchen remodel by Ofir Construction — modern cabinets and stone countertops — Ofir Construction Inc.

The sequence is the schedule. Cabinets order before demo, stone templates after cabinets set, and every rough inspection closes before walls close. That order — unglamorous as it sounds — is what keeps kitchen projects moving instead of stalling for weeks.

What's included

  • Kitchen design and remodeling from layout to finishes
  • Custom kitchen cabinets and cabinet refacing
  • Countertops — quartz, granite, and butcher block
  • Kitchen backsplash installation and tile
  • Kitchen island installation and structural opening work
  • Kitchen lighting — task, ambient, and under-cabinet
  • Kitchen flooring
  • Plumbing and electrical for kitchens, including gas and venting

Why homeowners pick Ofir

  • Cabinet-and-countertop rebuilds, islands, and full reconfigurations that open cramped mid-century plans.
  • A polite, thorough crew — the words our Google reviewers use most.
  • Free written estimates with clear scopes, across our service area.
  • Licensed and accountable — CSLB #1036242, verify us at cslb.ca.gov.
  • One contract for design, permits, every trade, and the final walkthrough.
Kitchen countertop installation during a Winnetka kitchen remodel
Kitchen countertop installation during a Winnetka kitchen remodel

Signs it's time to call

  • Cabinet doors sag, stick, or show water damage at the sink base
  • The kitchen feels dark no matter how many lamps you add
  • Counter space and storage disappeared years ago
  • The appliances are newer than the kitchen around them

How the project runs

  1. 1

    Layout study: traffic, storage, and appliance positions

  2. 2

    Selections lock: cabinets, stone, fixtures — priced in writing

  3. 3

    Permits, demo, and rough inspections in one motion

  4. 4

    Template-and-install sequence for stone, then final walkthrough

Timeline: Six to ten weeks on site for a full remodel, with cabinet lead times setting the start date. We order early so the calendar never depends on hope.

Getting ready: Kitchen prep is mostly packing: box up counters and cabinets, empty the future fridge footprint, and set up a temporary pantry and coffee station. We seal doorways, protect floors, and sequence plumbing so water stays on as long as possible.

Kitchen remodel installation and assembly work by skilled workers in the San Fernando Valley
Kitchen remodel installation and assembly work by skilled workers in the San Fernando Valley

How we price Kitchen Remodeling — and stand behind it

Every Kitchen Remodeling project starts with a free site visit and a written estimate: scope, line items, material allowances, and a calendar built from what we actually saw on your property — not a number guessed over the phone. The document says plainly what is included and what is not, so the only surprises are the pleasant kind. Change orders show up when you change the scope; if we overlooked something during our own walkthrough, correcting it is on us. Payment follows completed milestones rather than large up-front sums — California caps residential deposits at 10% or $1,000, and our contracts hold to that to the dollar. When the work is finished we walk it with you room by room against the written scope, close out the permit record, and leave the site clean. After move-in, one phone call reaches the same office that ran your project — the people who wrote the estimate answer the phone, not a new estimator starting from zero.

Related services: Bathroom Remodeling · Room Additions — Bathroom Remodeling and Room Additions often share a scope with Kitchen Remodeling on the same job, so combining them keeps one contract, one crew, and one calendar.

Serving Chatsworth, Mission Hills, Canoga Park, Woodland Hills and nearby

Google review★★★★★
“Phenomenal work designing and executing. The crew was professional, clean, and polite — we would hire them again.”
Idan B.kitchen remodel · Winnetka, CA5.0★ on Google

Questions we hear about kitchen remodeling

How long does a kitchen remodel take?

A full kitchen remodel typically runs six to ten weeks on site once materials are on hand. Cabinet lead times drive the calendar, so we order early and give you a dated schedule.

Can you move plumbing or add an island?

Yes. Moving sinks, adding islands with power and water, and opening walls between kitchen and living space are routine parts of our scopes — permits included.

Do you work on condos and townhomes?

Yes, where association rules allow. We coordinate HOA work-hour and elevator rules alongside the permits.

What if I only want new counters and backsplash?

That's a normal job for us too. Small scopes get the same written estimate and tidy-crew treatment — we won't invent work your kitchen doesn't need.

Talk to Ofir about your project

Free estimate · Licensed · CSLB #1036242 · 20641 Schoolcraft St, Winnetka, CA 91306

Sun 9–5 · Mon–Thu 9–6 · Fri 9–2 · Sat closed — messages answered next business day.