ADU Construction and Garage Conversions

Quick answer: Turn an unused garage or backyard corner into a permitted, rentable living unit. We handle ADU design, permits, and inspections in-house — the fastest legal way to add space or income to a Valley property.
ADU built by Ofir Construction — permitted accessory dwelling unit in Los Angeles County
ADU built by Ofir Construction — permitted accessory dwelling unit in Los Angeles County — Ofir Construction Inc.

The difference between an ADU that pencils and one that stalls is the paperwork. We verify zoning, setbacks, and utilities on your parcel before you spend on plans, then run the ministerial submittal ourselves.

What's included

  • ADU design and construction — detached and attached
  • Garage conversions to livable, permitted space
  • Junior ADUs and garage additions above existing structures
  • Kitchenettes, bathrooms, and separate utility connections
  • State and local ADU permit compliance (ministerial review)
  • Fire separation and access requirements
  • Utility tie-ins, HVAC, and insulation to code
  • Final inspection and certificate of occupancy support

Why homeowners pick Ofir

  • Permitted, rentable units with design and inspections handled in-house.
  • Licensed and accountable — CSLB #1036242, verify us at cslb.ca.gov.
  • One contract for design, permits, every trade, and the final walkthrough.
  • Permits and inspections handled in-house by our own office.
  • A polite, thorough crew — the words our Google reviewers use most.
ADU construction services — garage conversion to permitted living space
ADU construction services — garage conversion to permitted living space

Signs it's time to call

  • The garage hasn't parked a car in years
  • You want rental income but don't know if your lot qualifies
  • Family needs a nearby place that isn't your guest room
  • You've heard ADU rules got easier but not what they mean for your parcel

How the project runs

  1. 1

    Feasibility walk: zoning, setbacks, utilities on your parcel

  2. 2

    Design and written scope with permit strategy

  3. 3

    Ministerial ADU permit submittal and corrections

  4. 4

    Build, inspect, and hand over ready-to-rent space

Timeline: Plan and permit stages commonly run two to three months on the ministerial ADU path; construction eight to sixteen weeks depending on size and whether it's a conversion or a detached build.

Getting ready: Garage-conversion prep is simple — empty the garage. Detached ADUs need a clear path for equipment and materials. Either way we confirm utility routes and staging during the site visit, so surprise is not part of the estimate.

Accessory dwelling unit design — detached backyard ADU for a Valley lot
Accessory dwelling unit design — detached backyard ADU for a Valley lot

How we price ADU and Garage Conversions — and stand behind it

Every ADU and Garage Conversions project starts with a free site visit and a written estimate: scope, line items, material allowances, and a calendar built from what we actually saw on your property — not a number guessed over the phone. The document says plainly what is included and what is not, so the only surprises are the pleasant kind. Change orders show up when you change the scope; if we overlooked something during our own walkthrough, correcting it is on us. Payment follows completed milestones rather than large up-front sums — California caps residential deposits at 10% or $1,000, and our contracts hold to that to the dollar. When the work is finished we walk it with you room by room against the written scope, close out the permit record, and leave the site clean. After move-in, one phone call reaches the same office that ran your project — the people who wrote the estimate answer the phone, not a new estimator starting from zero.

Related services: Room Additions · New Construction — Room Additions and New Construction often share a scope with ADU and Garage Conversions on the same job, so combining them keeps one contract, one crew, and one calendar.

Serving Panorama City, Lake Balboa, Chatsworth, Granada Hills and nearby

Google review★★★★★
“Seven months of water damage, and their crew finished in under two weeks — with the best quote we got.”
Andy G.water damage rebuild · Winnetka, CA5.0★ on Google

Questions we hear about adu and garage conversions

Can my garage become an ADU?

In most residential zones around the Valley, yes — garage conversions are specifically protected by state ADU law. We verify your parcel during the site visit, including setbacks and utility capacity.

How long does ADU permitting take?

State law requires ministerial (no-discretionary) review of compliant ADU plans, typically within 60 days of a complete submittal. Our office prepares and manages that submittal for you.

How much space can an ADU have?

State law generally protects a detached ADU of up to 800 square feet from discretionary denial, with four-foot side and rear setbacks. Exact limits vary by lot and ordinance — we confirm yours in writing.

Do I need a separate entrance and utilities?

Yes — an ADU needs independent access, and most projects add a separate electrical sub-panel and sometimes a separate water shutoff. We scope all of it up front so the estimate is the estimate.

Talk to Ofir about your project

Free estimate · Licensed · CSLB #1036242 · 20641 Schoolcraft St, Winnetka, CA 91306

Sun 9–5 · Mon–Thu 9–6 · Fri 9–2 · Sat closed — messages answered next business day.